Skip to workspace

Sustainability

Steel, decarbonisation and regulatory evidence for industrial decisions.

Work areas

Select the required decision

Each area keeps the calculation boundary, source, assumptions and evidence with the result.

SteelISO 14404 · ISO 20915 · ISO 14067 · IEA 2024Industrial transitionGHG Protocol · ISO 14064-1/-2/-3Product and disclosureISO 14040/44 · EPD · ESRS · CPR · EPBD
EU & border mechanisms

Scope, emissions and exposure

Product classification, installation-level data, actual-versus-default comparison and separate scenario analysis.

01

Product scope

Public

Search an 8-digit CN code, 6-digit HS code or product description. A negative result is definitive only when the complete approved mapping is installed.

02

EU CBAM indicative exposure

Definitive period

This is an auditable planning estimate. It does not convert a benchmark into an adjustment unless the required product and phase-out inputs are explicitly supplied.

03

Embedded-emissions data assembly

Installation level
Precursors
04

Reduction and price scenario

Planning
05

UK CBAM readiness

Separate framework

The UK assessment is kept separate from the EU certificate model. It checks installed scope data and registration-readiness inputs.

Steel

Emissions, routes and procurement

Physical production data, product boundaries, numerical screens and commercial comparisons remain distinct.

Site intensityISO 14404 route method
Product resultISO 20915 + ISO 14067 boundary
Near-zero screenIEA 2024 · crude steel · physical emissions
ClaimsPhysical, mass balance and certificates separated
01

Steel emissions intensity

User-controlled boundary

Enter attributable physical emissions for one controlled reporting period. Offsets and separately traded certificates are recorded but never deducted from physical intensity.

02

IEA near-zero numerical screen

Not certification

The screen uses the 2024 IEA scrap-adjusted threshold for physical emissions per tonne of crude steel. Programme labels and certifications require their own current rules.

03

Production-route comparison

Route inputs required
Route casesUse the first route as the reference case and record the source for each input.
04

Steel procurement comparison

Landed cost and evidence
Supplier offersThe first offer is the comparison reference.
05

Claims and chain-of-custody record

Readiness only
Industrial decarbonisation

Baseline, measures and delivery

Connect facility emissions to engineering measures, investment assumptions, annual milestones and implementation controls.

01

Facility inventory

GHG Protocol · ISO 14064-1
Activity rowsQuantity, factor, unit, scale and source remain explicit.
02

Measure economics

ISO 14064-2 project record
03

Annual pathway

Scenario · not forecast
Measures in pathwayEnter effective abatement after overlaps. Use an exclusive group for alternatives that cannot coexist.
04

Delivery controls

Project readiness
Established project controls
Engineering controlAbatement, energy demand, cost, schedule and technology performance must be supported by a controlled source and reconciled for interactions before an investment decision.
Methods and standards

Choose the right study architecture

The workspace maps intended outputs to the standards, boundaries and controls they require. It does not claim a full LCA database or verified EPD engine.

Life-cycle assessmentISO 14040 · ISO 14044Principles, framework, requirements and interpretation
Product carbon footprintISO 14067 · GHG Product StandardClimate-change result within an LCA-consistent frame
Type III declarationISO 14025:2026 · ISO 21930PCR, declared unit, indicators and independent verification
01

Study-design readiness

Method selection

Use this before calculation. It identifies missing decisions that make product results incomparable or unsuitable for publication.

Reference architecture

Standards register

Edition and transition state are stored separately from implementation guidance and calculation data.

LCAISO 14040 / 14044

Goal and scope, inventory, impact assessment, interpretation, reporting and review.

Product GHGISO 14067 / GHG Product Standard

Product carbon-footprint quantification and life-cycle GHG accounting.

Organisational GHGISO 14064-1 / GHG Corporate Standard

Inventory boundaries, sources, removals, base year, quality and reporting.

Projects and verificationISO 14064-2 / 14064-3

Project-level reductions and validation or verification controls.

EPDISO 14025:2026 / ISO 21930 / EN 15804

Type III declarations, construction-product core rules and PCR-led verification.

Environmental statementsISO 14020:2022 / 14021:2026 / 14024:2026 / 14026

General principles, self-declared claims, ecolabel programmes and footprint communication.

OperationsISO 14001:2026 / ISO 50001 / ISO 14083

Environmental management, energy performance and transport-chain GHG.

Water and resourcesISO 14046 / ISO 59020 / ISO 14051

Water footprint, circularity performance and material-flow cost accounting.

PCR and data qualityISO/TS 14027 / ISO 14033

Product-category rule governance and reliable quantitative environmental information.

Energy auditISO 50002-1:2025

Structured energy-audit scope, evidence, analysis and improvement opportunities.

Reporting and assurance

CSRD, ESRS and VSME evidence

A reporting file is organised around perimeter, impacts and risks, disclosures, controls, review and traceability—not a long questionnaire.

  1. 1Scope & perimeter
  2. 2IRO & materiality
  3. 3Policies, actions & targets
  4. 4Metrics & datapoints
  5. 5Evidence & controls
  6. 6Review & assurance
01

Reporting-file readiness

Governance triage

This does not issue a legal scope opinion. It tests whether the organisation can document the reporting basis and produce a controlled evidence file.

02

Disclosure register

Versioned
03

Materiality assessment record

Decision support
Construction and buildings

Product declarations and whole-life carbon evidence

One construction-product record can support CPR documentation, an EPD programme, building product data and an EPBD life-cycle GWP calculation.

Product rulesRegulation (EU) 2024/3110Product identification, intended use, performance, conformity and digital information.
Environmental declarationISO 14025:2026 · ISO 21930 · EN 15804PCR-led LCA, declared unit, modules, indicators, programme rules and verification.
Building performanceEPBD · life-cycle GWPBuilding-level product quantities, modules, service life, operational energy and national calculation rules.
01

CPR and EPD evidence readiness

Construction product
Life-cycle modules covered
02

Building life-cycle GWP readiness

EPBD
Supply chain

Supplier, chemical and due-diligence evidence

Requests are structured once and linked to the product, installation, reporting period and evidence file.

01

Supplier data request

Account workspace
02

REACH Candidate List

Exact dataset search
03

EUDR evidence readiness

Due diligence
Product data

Digital and circularity records

Readiness tools keep product identity, composition, evidence, recycled content and end-of-life information reusable across regulations.

01

Digital Product Passport readiness

Product record
Available product records
02

Product-boundary mass balance

Not an LCA